When a new mold is the right path
Most launches begin with existing bottle molds and customise the finish, cap, logo and box. That removes tooling cost and tooling lead time, and it is usually the faster route to a first order. A new mold becomes the better choice when a shape, weight or neck geometry cannot be matched from the molds that already exist.
- The bottle silhouette must be exclusive to the brand
- The capacity or proportions are not available from existing molds
- The neck or closure system needs a specific new geometry
- The project is planned at a volume that supports tooling investment
What the tooling decision affects
Opening a mold changes the commercial shape of a project, not only the bottle. The tooling cost, the lead time before the first sample, the minimum order and the reorder plan all follow from it.
- Tooling cost is quoted per project
- Lead time is normally 15 to 30 days
- Trial samples must be approved before bulk production
- A new molded bottle is normally planned from 10,000 bottles